Generally the permit can be issued within 24 hours.
AC/Furnace combination
Air conditioner
Boilers*
Electrical service change
Furnace replacement
Gas Lines*
Lawn sprinkler
Miscellaneous mechanical, plumbing or electrical
Replacement windows
RESIDENTIAL Re-Roof (Wind load 130, Snow load 60-ground 60-roof, Exposure C)
Siding (requires a house wrap/mid inspection)
Water heater (stickers must remain on the windows until inspections pass)
*These will be classified as one stops due to their permit type; however, a plan review is required.
For details on the required information for these permit types, click here.
NOTE: All Commercial Roofs require a plan review. Refer to the commercial roof checklist and the plan review section.
Applications for One Stop Permits can be submitted: cityclerk [at] idahospringsco.com (mailto:cityclerk[at]idahospringsco[dot]com)